Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 26 - Feb. 1, 2014

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

TOLL DOLLARS AT WORK

 

The westbound span may be closed Sunday through Thursday from 8 p.m. to 5 a.m. the following morning and Friday from 9 p.m. to 8 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

The eastbound span may be closed Saturday from 8 p.m. to 9 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the westbound span may be closed Monday and Tuesday from 9 a.m. to 3:30 p.m. and Wednesday and Thursday from 9 a.m. to 2:30 p.m. for preservation/maintenance work. 

One lane of the eastbound span may be closed Friday from 9 a.m. to 1 p.m. for preservation/maintenance work.  Two-way traffic will operate on the westbound span.

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span.  Motorists wishing to use an E-ZPass® Only lane to access the eastbound span should use toll lanes 6 or 9.

Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up. 

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION
CALL 1-877-BAYSPAN (1-877-229-7726) or visit baybridge.com

Know Before You Go - call 511 or visit MD511.org.  Follow the MDTA at twitter.com/TheMDTA, facebook.com/TheMDTA and mdta.maryland.gov. 

    

###