March 29, 2013

Contact:          Kelly Melhem

                      410-537-1017

Facility: (US 50/301) Bay Bridge

BayBridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of March 31 - April 6, 2013

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

TOLL DOLLARS AT WORK

The westbound span may be closed Monday through Wednesday from 8 p.m. to 5 a.m. and Thursday through Saturday from 9 p.m. to 5 a.m. the following morning for preservation/maintenance work.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

One lane of the eastbound span may be closed Tuesday through Thursday from 9 a.m. to 2:30 p.m. for preservation/maintenance work.  Two-way traffic will operate on the westbound span.

One lane of the westbound span may be closed Friday from 9 a.m. to 12 noon for preservation/maintenance work.

When daytime two-way traffic is in effect on the westbound span, toll lanes

1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span.  Motorists wishing to use an E-ZPass®Only lane to access the eastbound span should use toll lanes 6 or 9.

Have you considered carpooling?  Call 1-800-745-RIDE or visit mtamaryland.com.