FOR IMMEDIATE RELEASE

March 15, 2013

Contact:          John Sales

                      410-537-1017

Facility: (US 50/301) Bay Bridge

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes.  

TOLL DOLLARS AT WORK

The westbound span may be closed Sunday from 10 p.m. to 5 a.m. the following morning, Monday through Thursday from 8 p.m. to 5 a.m. the following morning and Friday and Saturday from 9 p.m. to 8 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closures.

One lane of the eastbound span may be closed Monday through Thursday from 9 a.m. to 2:30 p.m. and Saturday from 8 a.m. to 4 p.m. depending on traffic for preservation/maintenance work.  Two-way traffic will operate on the westbound span.

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span.  Motorists wishing to use an E-ZPass®Only lane to access the eastbound span should use toll lanes 6 or 9.

Have you considered carpooling?  Call 1-800-745-RIDE or visit mtamaryland.com.