Skip Navigation

Skip to Main Content

MDTA Traffic Advisories

The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.
Date: May 30, 2014

FOR IMMEDIATE RELEASE

Facility: (I-895) Baltimore Harbor Tunnel

(I-895) Baltimore Harbor Tunnel Lane Closures for the Week of June 2, 2014

The Southbound Tunnel is scheduled to be closed at 9:00 p.m. is scheduled to be closed at 9:00pm on the evening of June 2 and June 3, 2014  for maintenance operations.  Re-opening is scheduled to take place at 4:00 a.m. the following morning.

The Northbound Tunnel is scheduled to be closed at 9:00 p.m. on the evening of June 4 and 5, 2014  for maintenance operations.  Re-opening is scheduled to take place at 4 a.m. the following morning.

This is a tentative schedule that is subject to change at any time with little notice due to weather, traffic conditions, emergency incidents, or priority closures.

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of June 1 - 7, 2014 

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

TOLL DOLLARS AT WORK

 

REMINDER:  MANDATORY HEADLIGHT USE AREA signs have been installed.  Headlights are required at all times on the bridge.

 

The eastbound span may be closed Sunday from midnight to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closures.

The westbound span may be closed Monday through Wednesday from 10 p.m. to 5 a.m. the following morning, Thursday from 11 p.m. to 5 a.m. the following morning and Saturday from 11 p.m. to 7 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

One lane of the eastbound span may be closed Monday through Wednesday from 9 a.m. to 2:30 p.m. and Thursday from 9 a.m. to 1 p.m. for preservation/maintenance work.  Two-way traffic will operate on the westbound span.

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span.  Motorists wishing to use an E-ZPass® Only lane to access the eastbound span should use toll lanes 6 or 9.

Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up. 

The MDTA offers the following travel tips for the summer months:

·         Travel off-peak when heading to and from the Eastern Shore.  The best times to travel the Bay Bridge on weekends include:

  •          Friday before 10 a.m. and after 10 p.m.
  •          Saturday before 7 a.m. and after 5 p.m.
  •          Sunday before 10 a.m. and after 10 p.m.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit baybridge.com

Know Before You Go - call 511 or visit MD511.org.  Follow the MDTA at twitter.com/TheMDTA, facebook.com/TheMDTA and mdta.maryland.gov.