Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

 Scheduled for the Week of May 11 - 17, 2014

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

TOLL DOLLARS AT WORK

REMINDER:  MANDATORY HEADLIGHT USE AREA signs have been installed.  Headlights are required at all times on the bridge.

The eastbound span may be closed Sunday from 11 p.m. to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closures.

The westbound span may be closed Monday through Wednesday from 9 p.m. to 5 a.m. the following morning, Thursday from 10 p.m. to 5 a.m. the following morning and Saturday from 11 p.m. to 7 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

One lane of the eastbound span may be closed Monday through Thursday from 9 a.m. to 2:30 p.m. for preservation/maintenance work.  Two-way traffic will operate on the westbound span.

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span.  Motorists wishing to use an E-ZPass® Only lane to access the eastbound span should use toll lanes 6 or 9.

Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up. 

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit baybridge.com

Know Before You Go - call 511 or visit MD511.org.  Follow the MDTA at twitter.com/TheMDTA, facebook.com/TheMDTA and mdta.maryland.gov.