Skip Navigation
Maryland Department of Transportation Homepage
Follow us on FacebookFollow us on TwitterMDTA Blog ListingsRSS Feed Listings
HOME

About the MDTA

MDTA Meetings and Minutes

MDTA Police

Toll Facilities

I-95 Express Toll Lanes

Toll Rate Calculator

Toll Rate Tables

E-ZPass

Traffic Advisories
Traffic Cameras

News Center

Environment

Emergency Information

Employment Opportunities

Projects and Studies

Public-Private Partnerships

Business with MDTA

I-95 Travel Plazas

Bookmark and Share
Download a free version of Adobe Acrobat Reader
MDTA Logo

 

MDTA Traffic Advisories

The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.
Keyword: (i-95) jfk hwy

FOR IMMEDIATE RELEASE

Oct. 29, 2014

Contact:           John Sales                                                                     

                        410-537-1017 

 

NEW I-95 ENTRANCE RAMPS FROM MD 43

OPEN TUESDAY, NOV. 4 AND THURSDAY, NOV. 6

Change to access points for I-95 from MD 43

MD43 Interchange

WHAT:          Weather permitting, new flyover entrance ramps to northbound and southbound I-95 from eastbound and westbound MD 43 (White Marsh Boulevard) will open to traffic.  The NEW entrance ramps will be accessible from the right lane on MD 43 and will be located prior to passing over I-95.  In addition, there now will be one ramp from eastbound MD 43 and one ramp from westbound MD 43 to access both northbound and southbound I-95.  There will be a second decision point on each ramp from MD 43 to access northbound or southbound I-95. 

WHEN:          The new flyover ramp for westbound MD 43 traffic to I-95 will open in time for morning commuters on Tuesday, Nov. 4.  The new flyover ramp for eastbound MD 43 to I-95 will open in time for morning commuters on Thursday, Nov. 6, after which the new traffic pattern shown above will be in effect (orange indicates new ramps). 

WHY:            The work is part of the reconstruction of the I-95/MD 43 interchange for the MD Transportation Authoritys (MDTA) I-95 Improvements with Express Toll Lanes (ETLSM) Project.

The new I-95 Express Toll Lanes are expected to open in December 2014.  For more information, visit mdta.maryland.gov.

Know Before You Go!  For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Find us on Facebook at facebook.com/TheMDTA Call 511 or visit MD511.org for statewide travel information.

###

 

FOR IMMEDIATE RELEASE

Oct. 17, 2014

Contact:          Tamory Winfield

 410-537-1017

 

DAILY OVERNIGHT LANE CLOSURES ON I-95 IN NORTHEAST BALTIMORE THIS MONTH

 

WHAT:          Weather permitting, two lanes of southbound and northbound I-95 between I -695 (Exit 64) and north of MD 43 (Exit 67) in Northeast Baltimore will be temporarily closed for overnight work.  Motorists should consider using US 40 or Bel Air Road as an alternate route.                          

WHEN:          Double-lane closures will occur on northbound and southbound I-95 Sunday through Saturday, from 8 p.m. to 5 a.m. the following morning, starting Oct. 19 through mid-November.  After 10 p.m., triple-lane closures may occur.  One or two lanes will remain open for traffic.                               

WHY:             Crews will be performing paving work for the Maryland Transportation  Authoritys (MDTA) I-95 Improvement Project with Express Toll Lanes (ETLSM). 

 

The new I-95 Express Toll Lanes are expected to open in December 2014.  For more information, visit mdta.maryland.gov.

Know Before You Go!  For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Find us on Facebook at facebook.com/TheMDTACall 511 or visit MD511.org for statewide travel information.  

###

 

FOR IMMEDIATE RELEASE

July 17, 2014

 Contact:          John Sales

 410-537-1017

 

WORK TO RESULT IN TEMPORARY OVERNIGHT LANE CLOSURES OF I-95 IN CECIL COUNTY JULY 20 - 24

 

WHAT: Weather permitting, two lanes of northbound or southbound I-95 between MD 222 (Exit 93) and MD 272 (Exit 100) in Cecil County will be temporarily closed for overnight work.  Motorists should consider using US 40 as an alternate route.  

 

WHEN: The southbound double lane closures will occur on Sunday, July 20 and Monday, July 21, from 9 p.m. to 5 a.m. the following morning.  The northbound double lane closures will occur on Tuesday, July 22 and Wednesday, July 23, from 9 p.m. to 5 a.m. the following morning. Traffic will continue in the remaining open lane.  In the event of inclement weather or other variables, work also may be performed Thursday, July 24.   

 

WHY: Work related to York Building Products project.

 

To view real-time traffic camera images on MDTA roadways, visit mdta.maryland.gov.  Know Before You Go!  Call 511 or visit MD511.org for statewide travel information.

 

Follow the MDTA at twitter.com/TheMDTA and facebook.com/TheMDTA.

 

The MDTA thanks motorists for their patience.

 

###

FOR IMMEDIATE RELEASE

June 5, 2014

Contact:          John Sales

410-537-1017

 

**UPDATED SCHEDULE**

OVERNIGHT CLOSURES OF I-95 IN

WHITE MARSH FOR THE WEEK OF JUNE 5 - 10

Closures part of I-95 Express Toll LanesSM Project

 

 

WHAT:           Weather permitting, all lanes of southbound or northbound I-95 at the MD 43 interchange (White Marsh Boulevard) in Northeast Baltimore will be temporarily closed for overnight work.  Traffic will be detoured to Exit 67 (eastbound White Marsh Boulevard), to eastbound MD 7 (Philadelphia Road), to westbound White Marsh Boulevard, to southbound or northbound I-95.

WHEN:           The southbound closure will occur on Thursday, from 11 p.m. to 5 a.m. the following morning. The northbound closures will occur on Saturday, from 11 p.m. to 7 a.m. the following morning and Monday and Tuesday, from 11 p.m. to 5 a.m. the following morning.  In the event of inclement weather or other variables, work also may be performed Wednesday and Thursday.   

WHY:              Crews will be erecting steel as part of the reconstruction of the I-95/MD 43 (White Marsh Boulevard) interchange for the Maryland Transportation Authoritys (MDTA) I-95 Express Toll Lanes (ETLSM) Project.

 

The new I-95 Express Toll Lanes are expected to open in late 2014.  For more information, visit I95ExpressTollLanes.com.

Follow the MDTA at mdta.maryland.gov, twitter.com/TheMDTA and facebook.com/TheMDTA.

 

###

FOR IMMEDIATE RELEASE

May 29, 2014

 Contact:          John Sales

 410-537-1017

 

OVERNIGHT CLOSURES OF I-95 IN WHITE MARSH

FOR THE WEEK OF MAY 31-JUNE 5

Closures part of I-95 Express Toll LanesSM Project

  

WHAT: Weather permitting, all lanes of southbound or northbound I-95 at the MD 43 interchange (White Marsh Boulevard) in Northeast Baltimore will be temporarily closed for overnight work.  Traffic will be detoured to Exit 67 (eastbound White Marsh Boulevard), to eastbound MD 7 (Philadelphia Road), to westbound White Marsh Boulevard, to southbound or northbound I-95.

 

WHEN: The southbound closures will occur on Saturday, from 11 p.m. to 7 a.m. the following morning and Monday and Tuesday, from 11 p.m. to 5 a.m. the following morning. The northbound closures will occur on Wednesday and Thursday, from 11 p.m. to 5 a.m. the following morning. 

 

WHY: Crews will be erecting steel as part of the reconstruction of the I-95/MD 43 (White Marsh Boulevard) interchange for the Maryland Transportation Authority's (MDTA) I-95 Express Toll Lanes (ETLSM) Project.

 

The new I-95 Express Toll Lanes are expected to open in late 2014.  For more information, visit I95ExpressTollLanes.com.

 

Follow the MDTA at mdta.maryland.gov, twitter.com/TheMDTA and facebook.com/TheMDTA.

 

###

FOR IMMEDIATE RELEASE

May 15, 2014

Contact:          John Sales

410-537-1017 

 

WORK TO RESULT IN TEMPORARY OVERNIGHT LANE CLOSURES OF I-95 IN CECIL COUNTY MAY 18 - 21

  

WHAT:           Weather permitting, two lanes of northbound and southbound I-95 between MD 222 (Exit 93) and MD 272 (Exit 100) in Cecil County will be temporarily closed for overnight work.  Motorists should consider using US 40 as an alternate route.  

WHEN:           Sunday, May 18 through Wednesday, May 21, from 11 p.m. to  5 a.m. the following morning, the two lanes of northbound and southbound I-95 will be closed.  Traffic will continue in the remaining open lane in each direction. 

WHY:              Work related to York Building Products project.

 

To view real-time traffic camera images on MDTA roadways, visit mdta.maryland.gov.  Know Before You Go!  Call 511 or visit MD511.org for statewide travel information.

Follow the MDTA at twitter.com/TheMDTA and facebook.com/TheMDTA.

The MDTA thanks motorists for their patience.

 

###

 

OVERNIGHT LANE CLOSURES OF SOUTHBOUND I-95 IN

WHITE MARSH FOR THE WEEK OF MAY 13 - 17

Closures part of I-95 Express Toll LanesSM Project

 

 

WHAT:          Weather permitting, two lanes of southbound I-95 at the MD 43 interchange (White Marsh Boulevard) in Northeast Baltimore will be temporarily closed for overnight work.                         

WHEN:          Double-lane closures will occur on southbound I-95 Tuesday through Thursday, from 9 p.m. to 5 a.m. the following morning.  After 10 p.m., periodic 5-10 minute traffic drags, during which police will bring vehicles to a reduced pace prior to the work zone, may occur.  Friday and Saturday, from 11 p.m. to 6 a.m. the following morning, double-lane closures will occur without traffic drags.

Please note that additional temporary, overnight closures may occur as necessary into next month.  The MDTA will issue traffic advisories when additional closures are scheduled. 

WHY:             Crews will be erecting steel as part of the reconstruction of the I-95/MD 43 (White Marsh Boulevard) interchange for the Maryland Transportation Authoritys (MDTA) I-95 Express Toll Lanes (ETLSM) Project. 

 

The new I-95 Express Toll Lanes are expected to open in late 2014.  For more information, visit I95ExpressTollLanes.com.

Follow the MDTA at mdta.maryland.gov, twitter.com/TheMDTA and facebook.com/TheMDTA.

 

###

FOR IMMEDIATE RELEASE

May 1, 2014

Contact:          John Sales

410-537-1017

 

 

OVERNIGHT CLOSURES IN

WHITE MARSH FOR THE WEEK OF MAY 5 - 8

Closures part of I-95 Express Toll LanesSM Project

 

WHAT:          Weather permitting, all lanes of northbound I-95 at the MD 43 interchange (White Marsh Boulevard) in Northeast Baltimore will be temporarily closed for overnight work.  Traffic will be detoured to Exit 67 (eastbound White Marsh Boulevard), to eastbound MD 7 (Philadelphia Road), to westbound White Marsh Boulevard, to northbound I-95.

Weather permitting, one lane in both directions of Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive will be temporarily closed for overnight work. 

WHEN:          Northbound I-95 closures will occur Monday through Thursday, from 11 p.m. to 5 a.m. the following morning. 

Single-lane closures will occur Monday through Thursday, from 9 p.m. to 5 a.m. the following morning in both directions of Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive.  Periodic 5-10 minute traffic drags, during which police will bring vehicles to a reduced pace prior to the work zone, may occur.

Please note that additional temporary, overnight closures may occur as necessary throughout this month.  The MDTA will issue traffic advisories when additional closures are scheduled. 

WHY:             Crews will be erecting steel as part of the reconstruction of the I-95/MD 43 (White Marsh Boulevard) interchange for the Maryland Transportation Authoritys (MDTA) I-95 Express Toll Lanes (ETLSM) Project. 

                       Campbell Boulevard will be widened to five lanes -- two lanes in each direction and a new center left-turn lane into Nottingham Square -- for improved traffic flow.  Campbell Boulevard with underpass lighting. 

 

Reminder:  Automated Speed Enforcement equipment is operational on southbound I-95 throughout the ETL work zone.

The new I-95 Express Toll Lanes are expected to open in late 2014.  For more information, visit I95ExpressTollLanes.com.

Follow the MDTA at mdta.maryland.gov, twitter.com/TheMDTA and facebook.com/TheMDTA.

 

###

FOR IMMEDIATE RELEASE

April 25, 2014

Contact:          Tamory Winfield

 410-537-1017

  

OVERNIGHT LANE CLOSURES OF I-95 IN

WHITE MARSH FOR THE WEEK OF APRIL 28 - MAY 3

Closures part of I-95 Express Toll LanesSM Project

  

WHAT:          Weather permitting, two lanes of southbound and northbound I-95 at the MD 43 interchange (White Marsh Boulevard) in Northeast Baltimore will be temporarily closed for overnight work.                         

WHEN:          Double-lane closures will occur on northbound and southbound I-95 Monday through Thursday, from 9 p.m. to 5 a.m. the following morning and Saturday, from 11 p.m. to 6 a.m. the following morning.  After 10 p.m., periodic 5-10 minute traffic drags, during which police will bring vehicles to a reduced pace prior to the work zone, may occur.        

Please note that additional temporary, overnight closures may occur as necessary into next month.  The MDTA will issue traffic advisories when additional closures are scheduled. 

WHY:             Crews will be erecting steel as part of the reconstruction of the I-95/MD 43 (White Marsh Boulevard) interchange for the Maryland Transportation Authoritys (MDTA) I-95 Express Toll Lanes (ETLSM) Project.  

 

The new I-95 Express Toll Lanes are expected to open in late 2014.  For more information, visit I95ExpressTollLanes.com.

Follow the MDTA at mdta.maryland.gov, twitter.com/TheMDTA and facebook.com/TheMDTA.

 

###

FOR IMMEDIATE RELEASE

April 18, 2014

Contact:          John Sales

410-537-1017

  

OVERNIGHT LANE CLOSURES IN

WHITE MARSH FOR THE WEEK OF APRIL 21 - 26

Closures part of I-95 Express Toll LanesSM Project

  

WHAT:          Weather permitting, two lanes of southbound and northbound I-95 at the MD 43 interchange (White Marsh Boulevard) in Northeast Baltimore will be temporarily closed for overnight work.    

                        Weather permitting, one lane in both directions of Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive will be temporarily closed for overnight work. 

WHEN:          Double-lane closures will occur on northbound and southbound I-95 Monday through Thursday, from 9 p.m. to 5 a.m. the following morning and Saturday, from 11 p.m. to 6 a.m. the following morning.  During Mondays closure on southbound I-95, periodic 10-15 minute traffic drags, during which police will bring vehicles to a reduced pace prior to the work zone, are scheduled.

Single-lane closures will occur Monday through Thursday, from 8:30 p.m. to 6 a.m. the following morning in both directions of Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive.

Please note that additional temporary, overnight closures may occur as necessary into next month.  The MDTA will issue traffic advisories when additional closures are scheduled. 

WHY:             Crews will be erecting steel as part of the reconstruction of the I-95/MD 43 (White Marsh Boulevard) interchange for the Maryland Transportation Authoritys (MDTA) I-95 Express Toll Lanes (ETLSM) Project.  

Campbell Boulevard will be widened to five lanes -- two lanes in each direction and a new center left-turn lane into Nottingham Square -- for improved traffic flow.  A new pedestrian sidewalk will be constructed along eastbound Campbell Boulevard with underpass lighting. 

 

The new I-95 Express Toll Lanes are expected to open in late 2014.  For more information, visit I95ExpressTollLanes.com.

Follow the MDTA at mdta.maryland.gov, twitter.com/TheMDTA and facebook.com/TheMDTA.

 

###

 

Contact Us  |   Accessibility  |   Privacy Notice  |   Terms of Use

E-ZPass and Video Tolling Customer Service - Toll Free: 1 (888) 321-6824
MDTA Management Offices: 2310 Broening Highway, Baltimore, MD 21224
Local: (410) 537-1000 - Out of Area: 1 (866) 713-1596