Skip Navigation
Maryland Department of Transportation Homepage
Follow us on FacebookFollow us on TwitterMDTA Blog ListingsRSS Feed Listings
HOME

About the MDTA

MDTA Meetings and Minutes

MDTA Police

Toll Facilities

I-95 Express Toll Lanes

Toll Rate Calculator

Toll Rate Tables

E-ZPass

Traffic Advisories
Traffic Cameras

News Center

Environment

Emergency Information

Employment Opportunities

Projects and Studies

Public-Private Partnerships

Business with MDTA

I-95 Travel Plazas

Bookmark and Share
Download a free version of Adobe Acrobat Reader
MDTA Logo

 

MDTA Traffic Advisories

The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.
Keyword: (i-95) jfk hwy

FOR IMMEDIATE RELEASE

June 19, 2015

 

WORK TO RESULT IN OFF-PEAK TEMPORARY LANE CLOSURES ON EASTBOUND CAMPBELL BOULEVARD IN WHITE MARSH

 

WHAT:          Weather permitting, one lane on eastbound Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive in White Marsh will be temporarily closed.  The entrance into the Nottingham Square shopping center closest to the I-95 overpass will be closed for left-turning vehicles during the periodic lane closures.  A temporary pedestrian walkway is located along the work zone on westbound Campbell Boulevard.

WHEN:          Closures will begin Monday, June 22, until late July.  Lane closures                     will take place during the following off-peak work hours: Mondays through Thursdays, 9 a.m. to 3 p.m.; Fridays, 9 a.m. to noon; and every day, 8:30 p.m. to 6 a.m. the following morning.  All dates and times are approximate and dependent on weather.

WHY:             The work is part of the reconstruction of the I-95/MD 43 interchange for the Maryland Transportation Authority’s (MDTA) I-95 Improvements with Express Toll Lanes (ETL) Project, and involves the reconstruction/widening of the existing I-95 bridge over Campbell Boulevard.  Campbell Boulevard will be widened to five lanes -- two lanes in each direction and a new center left-turn lane into Nottingham Square -- for improved traffic flow.  A new pedestrian sidewalk will also be constructed along eastbound Campbell Boulevard.

 

To view real-time traffic camera images on MDTA roadways, visit mdta.maryland.gov.  Know Before You Go!  For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Find us on Facebook at facebook.com/TheMDTA

The MDTA thanks motorists for their patience.

 

###

FOR IMMEDIATE RELEASE

June 17, 2015

 

**CANCELED**

(This will not be rescheduled. It was determined that work around that particular bridge over I-695 won't be necessary.)

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURE OF I-695 INNER LOOP IN NORTHEAST BALTIMORE THIS MONDAY

 

WHAT: All lanes of eastbound I-695 (INNER LOOP) at I-95 (Exit 33) will be closed. Traffic will be detoured to northbound I-95 (Exit 33), to eastbound MD 43 (Exit 67, White Marsh Boulevard), to eastbound MD 7, to westbound MD 43, to southbound I-95, to eastbound I-695 (Exit 64).

WHEN: Weather permitting, all lanes of eastbound I-695 (INNER LOOP) at I-95 (Exit 33) will be closed on Monday, June 22, from 10 p.m. to 5 a.m. the following morning. In the event of inclement weather or other variables, work also may be performed Tuesday, June 23.

WHY: Crews will be performing bridge work.

 

To view real-time traffic camera images on MDTA roadways, visit mdta.maryland.gov. For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us on Facebook at facebook.com/TheMDTA.

The MDTA thanks motorists for their patience.

 

###

FOR IMMEDIATE RELEASE

May 5, 2015

 

NEW TRAFFIC PATTERN FOR SOUTHBOUND I-95 MOTORISTS TO WHITE MARSH TOWN CENTER

MD43

 

WHAT: A new ramp movement and traffic signal will open for southbound I-95 motorists using Exit 67 (MD 43/White Marsh Boulevard) to access Honeygo Boulevard. To get to Honeygo Boulevard, southbound I-95 traffic should use Exit 67 and MUST keep left at the split (follow signs to White Marsh Town Center). There will be a new left turn only lane and signal at the end of the ramp. Drivers will turn left onto westbound MD 43, directly into a left turn only lane for southbound Honeygo Boulevard.

Note: Two left turn lanes for westbound MD 43 traffic to access Honeygo Boulevard will now be separated by a barrier. Southbound I-95 traffic that keeps right at the split on Exit 67 will NOT be able to access the left turn lanes onto Honeygo Boulevard.

WHEN: Weather permitting, the new traffic signal and configuration will be in effect Friday, May 8.

WHY: Toll Dollars At Work: The work is part of the reconstruction of the I-95/MD 43 interchange for the Maryland Transportation Authoritys (MDTA) I-95 Improvements with Express Toll Lanes (ETL) Project. The I-95 ETL are now open but there is still ongoing related construction along MD 43 and Campbell Boulevard.

FullMD43

To view real-time traffic camera images on MDTA roadways, visit mdta.maryland.gov. For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us on Facebook at facebook.com/TheMDTA. The MDTA thanks motorists for their patience.

 

###

 

 

 

FOR IMMEDIATE RELEASE

Oct. 29, 2014

Contact:           John Sales                                                                     

                        410-537-1017 

 

NEW I-95 ENTRANCE RAMPS FROM MD 43

OPEN TUESDAY, NOV. 4 AND THURSDAY, NOV. 6

Change to access points for I-95 from MD 43

MD43 Interchange

WHAT:          Weather permitting, new flyover entrance ramps to northbound and southbound I-95 from eastbound and westbound MD 43 (White Marsh Boulevard) will open to traffic.  The NEW entrance ramps will be accessible from the right lane on MD 43 and will be located prior to passing over I-95.  In addition, there now will be one ramp from eastbound MD 43 and one ramp from westbound MD 43 to access both northbound and southbound I-95.  There will be a second decision point on each ramp from MD 43 to access northbound or southbound I-95. 

WHEN:          The new flyover ramp for westbound MD 43 traffic to I-95 will open in time for morning commuters on Tuesday, Nov. 4.  The new flyover ramp for eastbound MD 43 to I-95 will open in time for morning commuters on Thursday, Nov. 6, after which the new traffic pattern shown above will be in effect (orange indicates new ramps). 

WHY:            The work is part of the reconstruction of the I-95/MD 43 interchange for the MD Transportation Authoritys (MDTA) I-95 Improvements with Express Toll Lanes (ETLSM) Project.

The new I-95 Express Toll Lanes are expected to open in December 2014.  For more information, visit mdta.maryland.gov.

Know Before You Go!  For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Find us on Facebook at facebook.com/TheMDTA Call 511 or visit MD511.org for statewide travel information.

###

 

FOR IMMEDIATE RELEASE

Oct. 17, 2014

Contact:          Tamory Winfield

 410-537-1017

 

DAILY OVERNIGHT LANE CLOSURES ON I-95 IN NORTHEAST BALTIMORE THIS MONTH

 

WHAT:          Weather permitting, two lanes of southbound and northbound I-95 between I -695 (Exit 64) and north of MD 43 (Exit 67) in Northeast Baltimore will be temporarily closed for overnight work.  Motorists should consider using US 40 or Bel Air Road as an alternate route.                          

WHEN:          Double-lane closures will occur on northbound and southbound I-95 Sunday through Saturday, from 8 p.m. to 5 a.m. the following morning, starting Oct. 19 through mid-November.  After 10 p.m., triple-lane closures may occur.  One or two lanes will remain open for traffic.                               

WHY:             Crews will be performing paving work for the Maryland Transportation  Authoritys (MDTA) I-95 Improvement Project with Express Toll Lanes (ETLSM). 

 

The new I-95 Express Toll Lanes are expected to open in December 2014.  For more information, visit mdta.maryland.gov.

Know Before You Go!  For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Find us on Facebook at facebook.com/TheMDTACall 511 or visit MD511.org for statewide travel information.  

###

 

FOR IMMEDIATE RELEASE

July 17, 2014

 Contact:          John Sales

 410-537-1017

 

WORK TO RESULT IN TEMPORARY OVERNIGHT LANE CLOSURES OF I-95 IN CECIL COUNTY JULY 20 - 24

 

WHAT: Weather permitting, two lanes of northbound or southbound I-95 between MD 222 (Exit 93) and MD 272 (Exit 100) in Cecil County will be temporarily closed for overnight work.  Motorists should consider using US 40 as an alternate route.  

 

WHEN: The southbound double lane closures will occur on Sunday, July 20 and Monday, July 21, from 9 p.m. to 5 a.m. the following morning.  The northbound double lane closures will occur on Tuesday, July 22 and Wednesday, July 23, from 9 p.m. to 5 a.m. the following morning. Traffic will continue in the remaining open lane.  In the event of inclement weather or other variables, work also may be performed Thursday, July 24.   

 

WHY: Work related to York Building Products project.

 

To view real-time traffic camera images on MDTA roadways, visit mdta.maryland.gov.  Know Before You Go!  Call 511 or visit MD511.org for statewide travel information.

 

Follow the MDTA at twitter.com/TheMDTA and facebook.com/TheMDTA.

 

The MDTA thanks motorists for their patience.

 

###

FOR IMMEDIATE RELEASE

June 5, 2014

Contact:          John Sales

410-537-1017

 

**UPDATED SCHEDULE**

OVERNIGHT CLOSURES OF I-95 IN

WHITE MARSH FOR THE WEEK OF JUNE 5 - 10

Closures part of I-95 Express Toll LanesSM Project

 

 

WHAT:           Weather permitting, all lanes of southbound or northbound I-95 at the MD 43 interchange (White Marsh Boulevard) in Northeast Baltimore will be temporarily closed for overnight work.  Traffic will be detoured to Exit 67 (eastbound White Marsh Boulevard), to eastbound MD 7 (Philadelphia Road), to westbound White Marsh Boulevard, to southbound or northbound I-95.

WHEN:           The southbound closure will occur on Thursday, from 11 p.m. to 5 a.m. the following morning. The northbound closures will occur on Saturday, from 11 p.m. to 7 a.m. the following morning and Monday and Tuesday, from 11 p.m. to 5 a.m. the following morning.  In the event of inclement weather or other variables, work also may be performed Wednesday and Thursday.   

WHY:              Crews will be erecting steel as part of the reconstruction of the I-95/MD 43 (White Marsh Boulevard) interchange for the Maryland Transportation Authoritys (MDTA) I-95 Express Toll Lanes (ETLSM) Project.

 

The new I-95 Express Toll Lanes are expected to open in late 2014.  For more information, visit I95ExpressTollLanes.com.

Follow the MDTA at mdta.maryland.gov, twitter.com/TheMDTA and facebook.com/TheMDTA.

 

###

FOR IMMEDIATE RELEASE

May 29, 2014

 Contact:          John Sales

 410-537-1017

 

OVERNIGHT CLOSURES OF I-95 IN WHITE MARSH

FOR THE WEEK OF MAY 31-JUNE 5

Closures part of I-95 Express Toll LanesSM Project

  

WHAT: Weather permitting, all lanes of southbound or northbound I-95 at the MD 43 interchange (White Marsh Boulevard) in Northeast Baltimore will be temporarily closed for overnight work.  Traffic will be detoured to Exit 67 (eastbound White Marsh Boulevard), to eastbound MD 7 (Philadelphia Road), to westbound White Marsh Boulevard, to southbound or northbound I-95.

 

WHEN: The southbound closures will occur on Saturday, from 11 p.m. to 7 a.m. the following morning and Monday and Tuesday, from 11 p.m. to 5 a.m. the following morning. The northbound closures will occur on Wednesday and Thursday, from 11 p.m. to 5 a.m. the following morning. 

 

WHY: Crews will be erecting steel as part of the reconstruction of the I-95/MD 43 (White Marsh Boulevard) interchange for the Maryland Transportation Authority's (MDTA) I-95 Express Toll Lanes (ETLSM) Project.

 

The new I-95 Express Toll Lanes are expected to open in late 2014.  For more information, visit I95ExpressTollLanes.com.

 

Follow the MDTA at mdta.maryland.gov, twitter.com/TheMDTA and facebook.com/TheMDTA.

 

###

FOR IMMEDIATE RELEASE

May 15, 2014

Contact:          John Sales

410-537-1017 

 

WORK TO RESULT IN TEMPORARY OVERNIGHT LANE CLOSURES OF I-95 IN CECIL COUNTY MAY 18 - 21

  

WHAT:           Weather permitting, two lanes of northbound and southbound I-95 between MD 222 (Exit 93) and MD 272 (Exit 100) in Cecil County will be temporarily closed for overnight work.  Motorists should consider using US 40 as an alternate route.  

WHEN:           Sunday, May 18 through Wednesday, May 21, from 11 p.m. to  5 a.m. the following morning, the two lanes of northbound and southbound I-95 will be closed.  Traffic will continue in the remaining open lane in each direction. 

WHY:              Work related to York Building Products project.

 

To view real-time traffic camera images on MDTA roadways, visit mdta.maryland.gov.  Know Before You Go!  Call 511 or visit MD511.org for statewide travel information.

Follow the MDTA at twitter.com/TheMDTA and facebook.com/TheMDTA.

The MDTA thanks motorists for their patience.

 

###

 

OVERNIGHT LANE CLOSURES OF SOUTHBOUND I-95 IN

WHITE MARSH FOR THE WEEK OF MAY 13 - 17

Closures part of I-95 Express Toll LanesSM Project

 

 

WHAT:          Weather permitting, two lanes of southbound I-95 at the MD 43 interchange (White Marsh Boulevard) in Northeast Baltimore will be temporarily closed for overnight work.                         

WHEN:          Double-lane closures will occur on southbound I-95 Tuesday through Thursday, from 9 p.m. to 5 a.m. the following morning.  After 10 p.m., periodic 5-10 minute traffic drags, during which police will bring vehicles to a reduced pace prior to the work zone, may occur.  Friday and Saturday, from 11 p.m. to 6 a.m. the following morning, double-lane closures will occur without traffic drags.

Please note that additional temporary, overnight closures may occur as necessary into next month.  The MDTA will issue traffic advisories when additional closures are scheduled. 

WHY:             Crews will be erecting steel as part of the reconstruction of the I-95/MD 43 (White Marsh Boulevard) interchange for the Maryland Transportation Authoritys (MDTA) I-95 Express Toll Lanes (ETLSM) Project. 

 

The new I-95 Express Toll Lanes are expected to open in late 2014.  For more information, visit I95ExpressTollLanes.com.

Follow the MDTA at mdta.maryland.gov, twitter.com/TheMDTA and facebook.com/TheMDTA.

 

###

 

Contact Us  |   Accessibility  |   Privacy Notice  |   Terms of Use

E-ZPass and Video Tolling Customer Service - Toll Free: 1 (888) 321-6824
MDTA Management Offices: 2310 Broening Highway, Baltimore, MD 21224
Local: (410) 537-1000 - Out of Area: 1 (866) 713-1596