Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of November 10 – 16, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of November 10 – 16, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

TEMPORARY CLOSURE OF BAY BRIDGE EASTBOUND SPAN TO ACCOMMODATE BAY BRIDGE RUN ON NOVEMBER 10

Submitted by Tamory Winfield on

TEMPORARY CLOSURE OF BAY BRIDGE EASTBOUND SPAN

TO ACCOMMODATE BAY BRIDGE RUN ON NOVEMBER 10

Two-Way Traffic Operations on Westbound Span; Motorists Should Anticipate Significant Delays;

Call 1-877-BAYSPAN (229-7726) for Traffic Information

(November 4, 2024) – The Maryland Transportation Authority (MDTA) is partnering with Anne Arundel and Queen Anne’s counties to accommodate the Bay Bridge Run on Sunday, November 10. The run will be held on the eastbound span of the bridge.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of November 3 – 9, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of November 3 – 9, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 27 – November 2, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of October 27 – November 2, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 20 – 26, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of October 20 – 26, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 13 – 19, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of October 13 – 19, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 6 – 12, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of October 6 – 12, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

Subscribe to

Keywords

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Jul 05

DriveEzMD Team - Iron Birds (Kickoff to Maryland 250 Celebration)

7 PM

Ripken Stadium
873 Long Drive
Aberdeen, MD 2100

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.

Iron Birds VS Greensboro (Kickoff to Maryland 250 Celebration)

Jul 10

Finance and Administration Committee Meeting - July 10, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Jul 11

DriveEzMD Team - Tyler the Creator at CFG Arena

6 PM

CFG Bank Arena
201 W Baltimore St.
Baltimore, MD 21201

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.