Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of September 22 – 28, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of September 22 – 28, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

TOLL DOLLARS AT WORK

The westbound span may be closed Sunday from midnight to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closure.

The eastbound span may be closed Monday through Wednesday from 9 p.m. to 5 a.m. the following morning, Thursday from 10 p.m. to 5 a.m. the following morning and Saturday from 11 p.m. to 7 a.m. the following morning for preservation/maintenance work. The nighttime closures feature deck removal and replacement for the eastbound bridge deck replacement project. Temporary concrete connection slabs are utilized for this crucial work, allowing for travel lanes to reopen each morning and for a smoother driving transition across work areas. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the westbound span may be closed Monday through Wednesday from 9 a.m. to 2:30 p.m. and Thursday from 9 a.m. to 1 p.m. for preservation/maintenance work.

Note: Lane closures may start earlier if traffic volumes allow. Motorists advised to call 1-877-BAYSPAN (229-7726) for 24/7 bridge conditions.

Travel off-peak when crossing from shore to shore. The best times to cross the Bay Bridge on weekends include:

  • Friday – eastbound before 10 a.m. & after 9 p.m. and westbound before 10 a.m. & after 8 p.m.
  • Saturday – eastbound before 7 a.m. & after 6 p.m. and westbound before 9 a.m. & after 7 p.m.
  • Sunday – eastbound before 10 a.m. & after 7 p.m. and westbound before 11 a.m. & after 10 p.m.

Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com.

For 24/7 real time Bay Bridge updates call 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com. You may also follow us on X/Twitter at https://x.com/TheMDTA where major incidents are covered.

Keywords

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Aug 21

DriveEzMD Team - Maryland State Fair

5 PM

Maryland State Fairgrounds
2200 York Rd
Lutherville Timonium, MD 21093

The DriveEzMD Outreach team will be on-site at the MD State Fair. Swing by to speak to knowledgeable staff, pickup promotional materials, and purchase transponders. 

5:00pm – 9:00pm

Aug 22

DriveEzMD Team - Maryland State Fair

9 AM

Maryland State Fairgrounds
2200 York Rd
Lutherville Timonium, MD 21093

The DriveEzMD outreach team will be on-site at the MD State Fair. Swing by to speak to knowledgeable staff, pickup promotional materials, and purchase transponders.

9:00 am – 9:00pm

Aug 22

DriveEzMD Team - Nat Bargatze at CFG Arena

6 PM

CFG Bank Arena
201 W Baltimore St.
Baltimore, MD 21201

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.