Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of December 8 – 14, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of December 8 – 14, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of December 8 – 14, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of December 2 – 7, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of November 24 – 26, 2024
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
Two-Way Traffic Operations on Westbound Span; Motorists Should Anticipate Significant Delays;
Call 1-877-BAYSPAN (229-7726) for Traffic Information
(November 4, 2024) – The Maryland Transportation Authority (MDTA) is partnering with Anne Arundel and Queen Anne’s counties to accommodate the Bay Bridge Run on Sunday, November 10. The run will be held on the eastbound span of the bridge.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
9 AM
Livestream
This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.
12 AM
Minker Banquet Hall
920 Principio Furnace Rd
Perryville, MD 21903
Susquehanna Workforce Network Cecil County Job Fair
Interested in working at the MDTA? Come find our booth at the Susquehanna Workforce Network Cecil County Job Fair on May 15th.
9 AM
Livestream
This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.