TEMPORARY CLOSURE OF BAY BRIDGE EASTBOUND SPAN
Two-Way Traffic Operations on Westbound Span; Motorists Should Anticipate Significant Delays;
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 30 – November 5, 2022
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of October 30 – November 5, 2022
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 23 – 29, 2022
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of October 23 – 29, 2022
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
TOLL DOLLARS AT WORK
SUNFEST BRINGS POTENTIAL FOR INCREASED WEEKEND TRAFFIC AT BAY BRIDGE
SUNFEST BRINGS POTENTIAL FOR INCREASED WEEKEND TRAFFIC AT BAY BRIDGE
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 16 – 22, 2022
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of October 16 – 22, 2022
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
TOLL DOLLARS AT WORK
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 9 – 15, 2022
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of October 9 – 15, 2022
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
TOLL DOLLARS AT WORK
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 2 – 8, 2022
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of October 2 – 8, 2022
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of September 25 – October 1, 2022
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of September 25 – October 1, 2022
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of September 18 – 24, 2022
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of September 18 – 24, 2022
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of September 11 – 17, 2022
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of September 11 – 17, 2022
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.