Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Aug. 27 – Sept. 2, 2017
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Aug. 27 - Sept. 2, 2017
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.