Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 11 – 17
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of March 11 - 17
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.
EXPECT HIGH WINDS TO IMPACT MDTA BRIDGES INTO SUNDAY
EXPECT HIGH WINDS TO IMPACT MDTA BRIDGES INTO SUNDAY
Follow us on Twitter at Twitter.com/TheMDTA or
call 1-877-BAYSPAN (229-7726) for 24/7 conditions at the Bay Bridge
EXPECT HIGH WINDS TO IMPACT MDTA BRIDGES INTO SUNDAY
EXPECT HIGH WINDS TO IMPACT MDTA BRIDGES INTO SUNDAY
Follow us on Twitter at Twitter.com/TheMDTA or
call 1-877-BAYSPAN (229-7726) for 24/7 conditions at the Bay Bridge
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 4 – 10
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of March 4 - 10
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.
MDTA IS READY FOR HIGH WINDS EXPECTED TOMORROW AT BAY BRIDGE
FOR IMMEDIATE RELEASE
March 1, 2018
MDTA IS READY FOR HIGH WINDS EXPECTED TOMORROW AT BAY BRIDGE
Follow us on Twitter at Twitter.com/TheMDTA or
call 1-877-BAYSPAN (229-7726) for 24/7 conditions at the Bay Bridge
STRONG WINDS EXPECTED FRIDAY INTO SATURDAY
Be prepared for wind warnings, restrictions and the potential for temporary traffic holds at Maryland Transportation Authority (MDTA) bridges Friday and Saturday. Any decision to hold traffic at a toll facility would be based upon current weather at a given facility. The MDTA will make every effort to keep all of its facilities open as long as conditions are deemed safe to do so. High winds would prevent two-way operations (when one lane of eastbound traffic travels on the westbound span) at the Bay Bridge during Friday's afternoon rush-hour period.
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 25 – March 3
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of Feb. 25 - March 3
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 18 – 24
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of Feb. 18 – 24
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.