Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge Traffic Pattern Update

Submitted by Tamory Winfield on

Bay Bridge Traffic Pattern Update

Off-peak Daytime and Nighttime Work Planned with Minimal Traffic Impacts

 

April 2, 2020 (Baltimore, Md.) –  With Maryland’s COVID-19 state of emergency and stay-at-home order in place, the Maryland Transportation Authority (MDTA) is leveraging extended off-peak periods from the currently reduced traffic volumes to expedite ongoing projects, inspections, and routine maintenance at the Bay Bridge while minimizing impacts to our customers.

In addition, now that the westbound right lane rehabilitation is finished more than a year ahead of schedule, the MDTA is able to return to regular, cyclical maintenance, repair and inspection schedules that are more familiar to motorists.

Drivers should expect single-lane closures on or approaching the Bay Bridge during daytime, off-peak hours as needed for ongoing projects, regular maintenance and facility inspections. 

Examples of the multiple ongoing projects include annual regulatory bridge inspections, work to bring all-electronic tolling to the bridge by this summer, and a separate project to install an automated gate system along westbound US 50 on the Eastern Shore that will allow maintenance crews to implement and remove two-way traffic operations at the bridge more safely and quickly.

Drivers should also expect off-peak overnight single-lane, double-lane or full-bridge closures of either span for preservation/maintenance work. Two-way traffic will operate on the open bridge span during full bridge closures.

For example, while the right lane is now reopened, some remaining work will occur on the westbound span center and left lanes during overnight or daytime off-peak hours, including deck sealing, steel railing replacement and deck/joint repairs and replacements. Motorists should expect some periods when steel plates will be placed in the center and left lanes.

All work will be performed weather and traffic volumes permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Headlights are required at all times on the bridge.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Sign up for email/text alerts at https://bit.ly/2Dh9EZn.  Find us at facebook.com/TheMDTA.  Call 511 or visit MD511.org for statewide travel information.

Blog Category

Blog Calendar

Public Calendar

Oct 30

Billy Strings at CFG Bank Arena

6:30 PM

CFG Bank Arena
201 W Baltimore St.
Baltimore, MD 21201

Come say hi! Stop by the DriveEzMD Outreach table before or after the event to grab some fun giveaways, chat with our team, and learn how E-ZPass can help make your travels around Maryland easier and more convenient.

Nov 05

Capital Committee Meeting

9:00 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Nov 07

Anne Arundel Historical Society Early Christmas Vendor Fair

8:00 AM

Benson-Hammond House
7101 Aviation Blvd,
Linthicum Heights, MD 21090

Stop by and visit DriveEzMD at the Early Christmas Fall Flea Market and Craft Fair! Connect with our outreach team to learn more about E-ZPass Maryland, explore the benefits of having an account, and get answers to your tolling questions. Enjoy a day of local vendors, handmade crafts, and seasonal shopping while discovering how DriveEzMD can make your travels easier.