Skip to main content
MDTA Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Historic Properties - Baltimore Harbor Tunnel

When the Baltimore Harbor Tunnel (Interstate 895) opened on Nov. 29, 1957, it was an event of national importance. The new tunnel was heralded widely as breaking the "Baltimore Bottleneck" for the first time ever. For years, traffic had crawled through Baltimore's narrow streets, then the only direct route between Philadelphia and the South.

The traffic situation peaked in the mid-1940s, when a federal official referred to Baltimore as "the worst city in the United States, as far as I know, on the matter of taking care of its through-traffic." The need to break this bottleneck was apparent, and Maryland's State Roads Commission -- predecessor of the Maryland Transportation Authority (MDTA) -- initiated plans under Maryland's Primary Bridge Program. The program, which was developed and approved in 1937, called for crossings of the Potomac, Susquehanna and Patapsco rivers and the Chesapeake Bay.

After a debate about the planned crossing's location, the State Roads Commission decided on a Canton-Fairfield crossing as the best solution to address the City and State's local- and through-traffic needs. Officials selected a tunnel, rather than a bridge, to carry the traffic after experts were convinced that the costs of a twin-tube tunnel could be supported by the toll revenues it would generate. Construction began in April 1955.

At the time, the tunnel was considered an engineering marvel. Each of the tunnel's 21 twin-tube sections is 300 feet long (the size of a football field) and was built in shipyards and launched like a ship. Tugs then towed the sections to the construction site. The tunnel was built using the opentrench method -- prefabricated sections were sunk in a trench dredged in the Baltimore Harbor's bottom, and the sections were joined under water.

An integral part of the tunnel is its ventilation system -- the means for removing the exhaust fumes of thousands of vehicles daily and constantly replenishing the tunnel with fresh air.

The system includes one ventilation shaft and building over each end of the tunnel. Fresh air is supplied through a duct under the tunnel roadway and distributed through air flues. These flues are located just above the roadway on each side of the tunnel.

Air in the tunnel tube is drawn off into a duct above the tunnel ceiling and then dispersed into the atmosphere. The two ventilation buildings house gigantic fans that supply fresh air and remove stale air. Carbon-monoxide levels in each tube are monitored around the clock.

The tunnel was an instant success. It eliminated 51 traffic signals for through-traffic in downtown Baltimore, provided a cross-harbor route for local commuters and diverted up to 40 percent of commercial-vehicle traffic from local streets.

Today, the Baltimore Harbor Tunnel handles more than 27.6 million vehicles annually. Along with the Fort McHenry Tunnel (Interstate 95) and the Francis Scott Key Bridge (Interstate 695), the Harbor Tunnel is part of a network of Baltimore Harbor crossings that provides convenient and safe transportation for local and interstate traffic.

The tunnel was determined eligible for the National Register in 2020. The full form is available here.

Baltimore Harbor Tunnel Entrance

WAS THIS PAGE HELPFUL?

Public Calendar

Jun 07

Join MDTA for its 2025 Public Service Project

9 AM

Rock Creek Park
Meadowside Nature Center
5100 Meadowside Lane
Rockville, MD 20855

Come join us for the 2025 MDTA Public Service Project at Kengla House across the street from Meadowside Nature Center at Rock Creek Regional Park! This hands-on event will give you the opportunity to make a positive impact on the community while enjoying the beauty of nature. Whether you're a seasoned volunteer or new to public service, there's a role for everyone!

Event Flyer

Saturday, June 7, 2055 (9 a.m. –– Noon) 
Rain or Shine

Volunteers will assist with:

  • Trail maintenance and improvements
  • Technical trail feature installation
  • Vegetation management
  • Pedestrian bridge entrance upgrades

SIGN UP NOW AT: BIT.LY/MDTAJUNE7

For questions about the event, please contact Jacquelyn DeAngelo at JDeAngelo@mdta.state.md.us.

 

 

 

Jun 12

Finance and Administration Committee Meeting - June 12, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Jun 26

MDTA Board Meeting - June 26, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.