Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

All-Electronic (Cashless) Tolling / AET

Fort McHenry Tunnel I-95 All Electronic (Cashless) Tolling

The Maryland Transportation Authority (MDTA) began all-electronic tolling (AET) construction work in Fall 2021 at the Fort McHenry Tunnel (I-95) toll plaza. The project will implement permanent highway-speed AET at the Fort McHenry Tunnel toll plaza. With cashless toll collection, there’s no slowing or stopping to pay tolls. Instead, motorists pay tolls at highway speed via E-ZPass, Pay-By-Plate or Video Tolling. Benefits include increased safety, less engine idling and better fuel efficiency.

The FMT project will convert the toll plaza area into highway-speed lanes by removing toll booths and canopy and will be completed in stages.

FMT I-95 All Electronic (Cashless) Tolling – Construction

Winter 2021 – Summer 2022

  • Toll lanes 6-8 Northbound are closed.
  • Toll lanes 16-19 Southbound are closed.
  • Removal of toll booths, islands and canopy in toll plaza lanes 6-8 Northbound and 16-19 Southbound.
  • Construction of tolling gantry and ITS/Electrical equipment installation.
  • Installation and testing of tolling equipment.

Summer 2022 – Fall 2023

  • Activation of overhead tolling gantry, and highway-speed cashless tolling begins through former toll plaza lanes 6-8 Northbound and 16-19 Southbound.
  • Removal of toll booths, islands, and canopy in lanes 1-5 and 9-11 Northbound, and lanes 14-15 and 20-24 Southbound.
  • Milling and final pavement overlay.

NORTHBOUND I-95

Fort McHenry Tunnel Driver’s Update

Starting March 28, weather permitting, four highway speed lanes through the former toll plaza will be open for motorists traveling I-95 northbound at the Fort McHenry Tunnel.

  • All motorists must obey the posted speed limits for the lane of travel.
  • Commercial vehicles and motorists using Exit 56/Keith Avenue should stay right.
  • Tolling remains in effect.
  • Always properly mount your E-ZPass transponder and keep your account up to date to receive the lowest toll rate.
  • Northbound tolls will be collected via new overhead electronic toll gantry just after the tunnel bore. 
  • With gantry activation, toll feedback displays in former plaza are deactivated.
  • Stay alert and adhere to overhead lane-use signals.

Fort McHenry Tunnel Toll Plaza That Was Then

FMT AET Toll Plaza Demolition

Fort McHenry Tunnel I-95 AET Configuration at Former Toll Plaza Site

Rendering of FMT plaza.

Fort McHenry Tunnel AET Gantry Along I-95 Northbound and Southbound

Fort McHenry Tunnel AET Gantry Along I-95 Northbound and Southbound

Gantries rendering

WAS THIS PAGE HELPFUL?

Public Calendar

Sep 17

Susquehanna Workforce Network Harford County Regional Job Fair

12:00 PM

APGFCU Arena
401 Thomas Run Road
Bel Air, MD 21015

Visit our table at the Susquehanna Workforce Network Count Regional Job Fair to explore exciting job openings and meet our dynamic team. The MDTA offers competitive salaries, excellent benefits, and career growth opportunities.

Sep 19

Susquehanna River Run

7:00 AM

Millard Tydings Memorial Park
Havre de Grace, MD 21078

Lace up for the Susquehanna River Run, presented by Charm City Run, at the Millard Tydings Memorial Park ! Stop by the DriveEzMD booth before or after the race to get help with your E-ZPass account, ask tolling questions, grab some free giveaways, and play games for a chance to win prizes. Come see us and cheer on the runners!

Sep 19

Essex Day Festival

11:00 AM

400-600 Blocks Eastern Blvd
Baltimore, MD 21221

Celebrate the 51st Annual Essex Day Festival with DriveEzMD! Stop by our booth to shop local vendors, enjoy the festivities, and visit us for E-ZPass account help. Our team will be on hand to answer tolling questions, help with E-ZPass sign-ups, and offer fun games and prizes.